NEWS

NEWS

NEWS

XIMETRIA

Project Management.

Ximetria provides, mainly, complete solutions of Project Management.

Our commitment to our customers is to work as their strategic ally in order to provide them solutions to satisfy their specific needs.

Your project
geneticists.

From the project feasibility regulations, architectural and engineering coordination according to the client and the project´s needs, permit management, construction supervision, facilities management, architectural finishing and equipment supplier, furniture and accessories installation to turnkey project delivery.

Perfection.

Precision.

Promptness.

Ximetria´s working structure.

Our methodology diagram.

Projects

  • Representative Projects
  • Offices
  • Housing
  • Hotels
  • Commercial
  • Institutional
  • Health
  • Monitoring and Evaluation
CompuSoluciones

This office project has 3 basement levels and 9 levels for offices, one penthouse, a coffee shop for the employments a daycare and a gym. 4 of this levels are the corporative offices of Compusoluciones and the other one will be different corporate offices.

RUNNING TIME: 17 MONTHS
CONSTRUCTION: 21,3345.00 m2

GUADALAJARA JALISCO.

Vista Acueducto

Office building, has 12 levels for offices and 4 basement levels for parking. Each level has 1,570m2 for offices in 4 prototypes. Has a triple-height lobby, 6 passengers elevators, one loading elevator and terraces.

Located in one of the most relevant financial area of the city.

RUNNING TIME: 24 MONTHS
CONSTRUCTION: 41,902.70 m2

GUADALAJARA, JALISCO.

Naos Living

Naos Living is a contemporary residential development, located in Rosaritos beach, B.C.N.
Currently under construction Phase 1: 1 Tower of 21 levels with 160 residences, 2 parking basements adding 233 parking lots. Amenities including: Lobby of two floor levels, spa, gym, sauna, massage area, outdoor pool and indoor swimming pool, kids pool, sun decks, grills and restaurant area.

RUNNING TIME: 10 MONTHS
CONSTRUCTION: 46,807 m2

ROSARITO, B.C.N.

HOLIDAY INN ACAPULCO LA ISLA

Business class hotel with 101 rooms and 5 suites, one of them is office suite; main floor lobby, 6 floors of rooms, service areas, pool, kids pool, outside bar, gardens, 2 meeting rooms, gym, lobby, laundry, administration areas, restrooms, board room.

RUNNING TIME: 9 MONTHS
CONSTRUCTION: 6,059 m2

ACAPULCO, GUERRERO.

PLAZA SENDERO ACAPULCO

Shopping Center located in the municipality of Acapulco, Juarez Guerrero, in a land of 15 hectares, which has 156 commercial premises, whose main anchor is Soriana, 10 movie theaters. Account with 2481 parking lot spaces and common areas.

RUNNING TIME: 9 MONTHS
CONSTRUCTION: 42,185.00 m2

ACAPULCO, GUERRERO

UNIVERSIDAD TECMilenio

Academic Center for school and college levels with 2 buildings of 5 and 4 levels respectively, building common areas of 5-level offices, coffee shop, laboratories, library, gym, 250 parking lot spaces, elevators, tennis sporting activities, panoramic ocean view.

RUNNING TIME: 10 MONTHS
CONSTRUCTION: 7,808.00 m2

ALVARADO, VERACRUZ

VAO DEVELOPMENT

Overall MASTER PLAN of 4 buildings in four phases: phase 1 office building, phase 2 tower mixed-use 45 levels, phase 3 and 4 vertical luxury residential housing. Upon completion of this project work and dwell in the group from 4000 to 5000, which generates a pole of development of great importance to the city.

RUNNING TIME: 48 MONTHS
CONSTRUCTION: 327,000.00 m2

SAN PEDRO GARZA GARCIA N.L.

DISTRIBUTION CENTER Master Choice

Distribution Center PERFECT CHOICE products consists in the first stage of an industrial ship of 10.000 m2 and 2.100 m2 of offices, then an extension to the industrial ship of 8600m2 as a second step, and there is a third stage in the construction of 3 buildings of 3.400 m2. In the first stage was considered the clubhouse with 1,100 m2 of construction, drivers rest area and guardhouse.

CONSTRUCTION: 12,000 m2

TLAQUEPAQUE, JAL.

 

Plaza Binaria

Mixed-use Project with leading edge technology and infrastructure. The Project hosts the main Hospital, doctors offices and Specialties Clinics in the area, to meet the growing medical demand in the north of the city. Will offer high demand of medical infrastructure in the area, actually with current void offer.

TRUNNING TIME: 15 MONTHS
CONSTRUCTION: 20,000.00 m2

ESCOBEDO N.L.

Courtyard, Saltillo

The Hotel will feature 180 rooms, distributed in 10 floor levels. The project has two basements parking for 86 vehicles. Some of the main areas are: motor lobby, front desk, gym, restaurant, lounge, laundry, meeting rooms, administrative offices.

RUNNING TIME: 12 MONTHS
CONSTRUCTION: 13,596.04 m2

SALTILLO, COAH.

Crowne Plaza, Puebla

The project has 8 floor levels and two basements. The pent-house is located at the 8. The Hotel will count with 155 guest rooms and 114 parking lots. Some of the most important areas are: motor lobby, semi-panoramic elevator, sundry shop, event hall with capacity for 300 people, bussines center, administrative offices, Indoor swimming pool, sun loungers by pool.

RUNNING TIME : 12 MONTHS
CONSTRUCTION: 14,694.41 m2

PUEBLA, PUE.

Holiday Inn Express & Suites, Chihuahua

This hotel project will be distribute in 7 levels and ground floor, with 13 rooms. Some of the most important areas are meeting rooms, vending, business center, administration areas, serving counter, gym, pool, jacuzzi. It is located at Paseo Vistas del Sol, In Chihuahua city.

RUNNING TIME : 9 MONTHS
CONSTRUCTION: 6,931.70 m2

CHIHUAHUA, CHIH.

Hampton Inn, Mérida

The aim of this project is develop a business class hotel, restaurant and lounges within a prime location at the north of Merida city, thus achieving that set to become the favorite one of everyone visiting the city. The project will be built in 5 floors and ground floor, will feature 130 rooms. 59 Parking lots for cars and 2 parking places for buses.

RUNNING TIME : 12 MONTHS
CONSTRUCTION: 6,913.87 m2

MÉRIDA, YUC.

Adana Aguascalientes

Adana Mall has a prime location, by Av. Tecnológico, to the east of Aguascalientes City. This Project takes places in a field of 96,794 m2. The Main Stores that Adana Mall will host are: Soriana, Cinépolis, Coppel, Del Sol, Office Depot y Toks. Parking area 57,206 m2, 1,100 parking lots.

RUNNING TIME : 10 MONTHS
CONSTRUCTION: 39,587.75 m2

AGUASCALIENTES, AGS.

Cleintes-XIMETRIA
Name:
Age:
Marital Status:
Address  
Street:
Number:
Colonia:
City:
CP:
Phone:
E-mail:
Move to another city:
Travel
Adjuntar CV

We become
indispensable
to our clients.

We make it
happen

MONTERREY
Av. Alfonso Reyes #2615, Piso 11 Suite 1108
Col. Del Paseo Residencial
Monterrey, Nuevo León
C.P. 64920 México
T.: +52 (81) 1352 2999

GUADALAJARA
Beethoven 4855
Col. Lomas del Seminario.
Zapopan, Jal.
T.+52 (33) 3288 4350

E-mail:info@ximetria.mx

Síguenos
X
Síguenos
X
Síguenos
X
cvxcv